Thanks for your input on Rebuilding on our clubs tow plane. I am now getting bids on just covering the fuselage. The bid would be to disasseble, sandblast, check for damage, damage repair extra as with any weld on stc's. I do not know what to expect and what it should look like after the work. I know good fabric job, tubing primed and painted, should it include rewiring the fuselage [it needs it] or is it extra. The bids I had for the entire covering is 20k to 24k but fixes were extra. I estimate covering and materials would run $5k for the job so I extrapalate that they must be charging $15K labor to do a entire plane. Would doing the fuselage be around $10K of that and would it or should it include fitting a new cowling, replace engine cables and hoses? I felt a few of the club members could do the wings with A and I input. We need an engine but they are now considering doing it when it gets worse as they just hung a new cyl last week. What labor or time does it take to cover a fuselage, not counting tubing repair. I know that would run extra.
I bet we could get at least $35K for it as it with the 180/ restricted due to field approval on 1967 PA18 std. I could get a Pawnee for near that. roll: :roll: You have been great...what are your thoughts.
Ps plus I completed the survey.. Mike :roll:
I bet we could get at least $35K for it as it with the 180/ restricted due to field approval on 1967 PA18 std. I could get a Pawnee for near that. roll: :roll: You have been great...what are your thoughts.
Ps plus I completed the survey.. Mike :roll: