Hi Guys, a question concerning Piper's Service Bulletin 1044 - installing an inspection cut-out under the leading edge fwd of the front lift strut attach point at the spar-- does anyone know if this became an AD? If it did I sure can't find it. If not an AD, is it a highly recommended thing to do?
I know Univair sells a kit to do this---are there any other ways to accomplish this w/o putting holes in the bottom side of the L/E?
I assume that this would be applicable to all Cubs--I've got a PA-11.
Thanks for any help,
Mutt
I know Univair sells a kit to do this---are there any other ways to accomplish this w/o putting holes in the bottom side of the L/E?
I assume that this would be applicable to all Cubs--I've got a PA-11.
Thanks for any help,
Mutt